River embankments - メーカー・企業と製品の一覧

River embankmentsの製品一覧

1~1 件を表示 / 全 1 件

表示件数

[Construction Example] Greening of a hill created at the port with consideration for the landscape.

Greening of the mound perimeter created at the port! Introducing a construction case of Kyoryokka 21.

We would like to introduce a case study of the "Kyoriyokker 21" used in the green space development project at Kochi New Port that our company undertook. Since there are no elevated areas around the port that can serve as evacuation sites during a tsunami, it was developed as a refuge for people working in the vicinity. It has been established as an evacuation site in the event of a tsunami. Additionally, it is a port where large cruise ships dock, and consideration has been given to the landscape. [Case Overview] ■ Developed as an evacuation site during a tsunami, 9 months after construction (August 2017) ■ View from the ship: A port where large cruise ships dock, with attention paid to the landscape, 9 months after construction (August 2017) *For more details, please download the PDF or feel free to contact us.

  • 【施工事例】高知新港緑地整備工事2.png
  • 【施工事例】高知新港緑地整備工事3.png
  • 【施工事例】高知新港緑地整備工事4.png
  • 【施工事例】高知新港緑地整備工事5.png
  • Other park materials
  • Wall and rooftop greenery

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録